Why was the decision made to build a new building?
  • The need for construction is due to the high level of physical and moral deterioration of buildings that were built in the 1950s-1970s.
  • The wear rate was more than 70%.
  • Technical inspections were carried out and cracks, defects in load-bearing structures and significant wear of the engineering infrastructure were identified.
 
What will be built as part of the modernization project?
As part of the project, a new medical complex with 300 beds and 15 modern operating rooms will be built.
 
Will the hospital continue to operate during construction?
Yes, the hospital does not stop its activities. Outpatient and inpatient treatment will be carried out as usual. 
 
Will construction affect patient admissions?
No, outpatient appointments will be held in the hospital's Polyclinic without changes.
 
How long will the construction take?
The project implementation period is 2026-2029.
 
Will the existing hospital buildings be demolished?
As part of the project, the old buildings built in the 1950s and 1970s will be demolished: the medical building on Baiseitova Street, the administrative and economic buildings. The main medical building will continue to operate normally. After the new complex is put into operation, the main medical building will be closed for major repairs.
 
What benefits will patients receive after the project is completed?
After the project is completed, patients will receive a modern clinic with the latest equipment and comfortable wards. A clinic that meets all domestic and international safety standards.
 
 
Will the medical equipment be updated?
Yes, as part of the project implementation, an update is provided 70% equipment.
 
How is the safety of patients and staff ensured during construction work?
During the project implementation period, protective structures with sound insulation were installed, safe routes for patients were provided, and patients were accompanied by medical personnel.
 
Where can I get up-to-date information about construction progress?
Актуальная и достоверная информация о ходе строительства будет размещаться на официальном сайте госпиталя – www.snh.kz , а также соц. сетях Instagram и Facebook- @sovminka.
 
Will the usual procedure for making appointments continue?
Yes, the procedure for making an appointment will be carried out in the same mode through the call center by calling-7071, 8-727-338-43-10, 8-776-338-43-10
 
Will the hospital's entrances and routes change?
Yes, admission of patients for inpatient treatment will take place through the checkpoint on Zhambyl Street.
The clinic operates normally.
How will the construction affect the parking lot and access to the hospital?
During the construction period, the entrance to the hospital will be accessible from Zhambyl Street.
The clinic operates normally.